Greetings
I have a 1000.4 on a post with a solo node hanging on the dish.
I am going to move the solo node into a detached garage to get it off the back side of the dish where it is just hanging, and get it inside. I will run 2 cables from the dish to the node and then a single cable from the node to the grounding block where the cable enters the primary residence.
Currently the cable from the solo node to the ground block is bonded to a clamp on the post and then to the ground block.
Since I will have 2 cables from the LNB to the node do I bond both of them to the post and then both to the node? And then the node to the ground block with a single ground?
If I don’t bond the ground of the 2 cables coming from the LNB to the post before they connect to the node, I don’t see how the dish will be grounded.
TIA
I have a 1000.4 on a post with a solo node hanging on the dish.
I am going to move the solo node into a detached garage to get it off the back side of the dish where it is just hanging, and get it inside. I will run 2 cables from the dish to the node and then a single cable from the node to the grounding block where the cable enters the primary residence.
Currently the cable from the solo node to the ground block is bonded to a clamp on the post and then to the ground block.
Since I will have 2 cables from the LNB to the node do I bond both of them to the post and then both to the node? And then the node to the ground block with a single ground?
If I don’t bond the ground of the 2 cables coming from the LNB to the post before they connect to the node, I don’t see how the dish will be grounded.
TIA