Hi guys, new here and will be attempting my first 5 lnb slimline install this weekend. I watched some of the videos from Solidsignal and read through the install pdf and think I can muddle my way through it. This may be a dumb question but, they say to connect the rg6 cables to the lnb's before aligning the pan but if I do that, how do you connect the Acutrack in line meter to help peak the signal ? I guess I could install 2 - 6 foot lengths of rg6 (for HR22) to the lnb's and use joiner's (those male to male adapters) to connect to the main feed after the alignment is done. Is there a better way to do this ? I thought it would be better not to have a joint in the line ie a direct cable run from the ird to lnb's.
Thanks
Thanks