I now have a dish set up with three dishes going into a DPP44 switch. The 110, 119, 129, & 148. I am going to add a dish for the 61.5 and not use the 148. After I peak the new dish for 61.5 with a hand held meter, what do I do next????
I know I will then connect the 61.5 to the port on the switch that the 148 was in, but after that do I just do a check switch and hope for the best??? If the 61.5 shows up after check switch then am I done???