Well what a heated discussion this is...lol. I am an installer, not PoV or CoV or contractor, I work directly for Corporate.
First of all the QA standards change weekly if not daily. I build every job be it an upgrade or New Install with RG6 solid copper cc, 60% braid swept to 3ghz period. all for $12 an hour. Thats ok with me cause if I do it the way they want me to do it in a neat and timely fashion, while keeping my SIN #s down they will give me more money per hour next year. Thats why I do it.. and I like the satisfaction I get from seeing the look on the customers face when they see what HD looks like running down the right cable and not 59. " Oh thats how HD is supposed to look.. thats beautiful"
Second "NEWSFLASH" Stonecold If I come to your house and you hand me a bag if Digicon compression fittings Im gonna throw them away... Then go about replacing all of the fittings you put on your cable because you thought you were doing the right thing... we cant use Digicon... If you want to use the right connectors get a bag of PPC F connectors.. its all we use.
Third.. "Once its built right it wont have to be done again". Well at least until they change the specs to 4ghz or something different.
Finally I agree with what Joe and Stonecold says except I say it differently... "If the wimp cant hang , then the wimp shouldnt of came." go flip burgers. Look at the bright side Its not S.E.A.L. training.
P.S. Ive lost 63 pounds since they made these changes.. My wife loves it and she shows me she loves it quite often.. If you get my drift.