Tech shows up and has already installed 1 Hopper and says job should be a piece of cake. He goes to his truck and realizes he has no Duo nodes. He had to call around and finally found 1 45minutes away. While we are waiting I ask him about the HIC and the general flow of how the install will go. He says that he has a HIC but a sling link will do the same. I asked him again about the HIC he didn't really like it but he said he would install it. So now we have about 30 more minutes of wait time til a Duo Node arrives.
Should I have let him install the sling link instead of the HIC or was I right?
Should I have let him install the sling link instead of the HIC or was I right?