Don't forget to run bolts through the pole or attach something to the bottom of the pole. You want something to prevent the pole from being turned inside the concrete or lifting out of the concrete but if you are using the existing concrete combined with new concrete you shouldn't have an issue.
Last FTA setup I did with a motorized 90cm I used 3-80lb pags of concrete and also filled the pipe up with concrete for extra support.