Finally something good hapening.
Approved to drift starting Monday 4/26
The drift was approved to start today 4/26?
or
the approval to drift was completed today 4/26?
I'm not a scientist so I'm not sure how long it takes to park a satellite. I'm assuming less than 30 days if it goes as planned.
Looking at the recent TLEs, it doesn't look like they've tightened up the orbit for continued testing. I also wonder if the testing has more to do with maneuvering systems than the satellite's signal retransmission capability.My guess is that the drift will start on Friday. I have NO inside information, but did see a hint from someone who knows that seemed to indicate the 30th. He could have been joking though.
Looking at the recent TLEs, it doesn't look like they've tightened up the orbit for continued testing. I also wonder if the testing has more to do with maneuvering systems than the satellite's signal retransmission capability.
The first sentence is fully self-contained -- it speaks to the evidence and a conclusion based on that evidence.And you think this why?
The first sentence is fully self-contained -- it speaks to the evidence and a conclusion based on that evidence.
The second sentence is speculation (and clearly indicated as such) about what might be going on instead.
that tle was completed at like 12:10am tuesday. its traveling at 2.5 degrees per day so close to or past 90 degrees. orbitron predicts dtv12 will be at 103 by may 10. if so, i'm predicting new hd starting may 19.
that tle was completed at like 12:10am tuesday. its traveling at 2.5 degrees per day so close to or past 90 degrees. orbitron predicts dtv12 will be at 103 by may 10. if so, i'm predicting new hd starting may 19.