Hope somone can help here. I have a 17 story high rise building w 8 Apartments on each floor. Approx 6 years ago we installed a 110/119 L Band system and had very few problems over the years. Now we have just installed an Eastern Arc Dish on the roof and have fed the 3 lines from the Dish down to the 1st floor. Tonight- I was cutting in the DishPro 34 switches and discoverd that power MUST be on all the time on all switches on port 1. Well if the customer switches off the power to the receiver on the first DP in line- it shuts down all the rest of the DP's signal all the way down to the last floor. Anyone know if we can make a power inserter for the 20V going into the DP34 or is there another way to make this work? Thanks