Hi -
If I upgrade my existing system: 922 and 612 to (1) hopper and (1) joey, would the tech need to re-wire any of the existing RG6 in place?
Thanks
If I upgrade my existing system: 922 and 612 to (1) hopper and (1) joey, would the tech need to re-wire any of the existing RG6 in place?
Thanks