While in the current orbit it will reach 110W on or a little after the 20th but there will still need to be an orbit diameter change to get it parked. It is indeed running a little behind schedule.It had until the 20th to finish testing and be up and running. It's on schedule since it's at 119 now to be at 110 by the 20th.