Hello, I'm wondering if I'm correct in my understanding so if someone could confirm or correct me I would appreciate it. I have a job later today in which I am adding a 4th Wally and will need to use a DPH42 switch to do this. Would I run 2 lines from Hybrid LNB directly to the hybrid ports on the switch, then on the other side have each port run a line to each individual Wally, one having a power inserter on it? I would just like to verify before I get to this job, any help is appreciated.