I'm looking to migrate our domain away from 2003 and over to 2012R2
The 2003 server does DHCP and DNS. The 2012R2 server is already a DC and runs DNS. I'll move DHCP over later.
Could I move the FSMO roles over to the 2012R2 DC and make it the primary and not impact the users if I do this during the day?
The 2003 server does DHCP and DNS. The 2012R2 server is already a DC and runs DNS. I'll move DHCP over later.
Could I move the FSMO roles over to the 2012R2 DC and make it the primary and not impact the users if I do this during the day?