My system has been fully installed, but now I'm waiting for my 211 to recieve programming, the 322 worked right out the box. The installer already made the call for authorizing, how long does it usually take?
Also, for phone lines, I'm to assume the 322 requires the phone line while the 211 doesn't need it?
Edit: Nevermind, right when I clicked Submit New Thread it turned on....
Also, for phone lines, I'm to assume the 322 requires the phone line while the 211 doesn't need it?
Edit: Nevermind, right when I clicked Submit New Thread it turned on....