I'm getting a Hopper and two Joeys installed on Saturday. I can't wait!
I currently have a 722k and 211K The existing coax is strung around my house and drilled through the sidings. I HATE this! I plan on redoing the siding in 12 months, so I want this mess GONE.
I ran new RG6 3GHz cables inside the walls/ceiling to my TVs. I have all of the cables coming into a "distribution panel" in my basement.
Here is a pic:
My questions:
1. Is the Tech going to be mad when he finds out he needs to install F connectors on both ends of my new runs? I have 6 runs I want done. I am going to offer him a $40 tip for this. Is this siffucient?
2. He is going to need to run two new cables from my DISH to the panel. It's about a 25' run, not difficult at all. I am going to pole mount my dish eventually because it's currently bolted on the side of the house. I don't like this, and I'm going to stucco the siding in 12 months. Should he leave a bunch of slack so when I call to get the pole installed, they don't have to rerun this coax?
3. I see two diagrams for my single Hopper install, with or without a Tap. Do I need the tap? What's the purpose of this?
4. Will the Tech provide the 2-way splitter for my two Joeys? The Solo Node and 2-way splitter will all be mounted on my board (see pic above).
Also, I already have a network connection where the Hopper will be located. So I'm 90% sure I won't need a HIC. I don't plan to do any network media stuff.
That's all I can think of. Any advice or wisdom to pass on??
I currently have a 722k and 211K The existing coax is strung around my house and drilled through the sidings. I HATE this! I plan on redoing the siding in 12 months, so I want this mess GONE.
I ran new RG6 3GHz cables inside the walls/ceiling to my TVs. I have all of the cables coming into a "distribution panel" in my basement.
Here is a pic:
My questions:
1. Is the Tech going to be mad when he finds out he needs to install F connectors on both ends of my new runs? I have 6 runs I want done. I am going to offer him a $40 tip for this. Is this siffucient?
2. He is going to need to run two new cables from my DISH to the panel. It's about a 25' run, not difficult at all. I am going to pole mount my dish eventually because it's currently bolted on the side of the house. I don't like this, and I'm going to stucco the siding in 12 months. Should he leave a bunch of slack so when I call to get the pole installed, they don't have to rerun this coax?
3. I see two diagrams for my single Hopper install, with or without a Tap. Do I need the tap? What's the purpose of this?
4. Will the Tech provide the 2-way splitter for my two Joeys? The Solo Node and 2-way splitter will all be mounted on my board (see pic above).
Also, I already have a network connection where the Hopper will be located. So I'm 90% sure I won't need a HIC. I don't plan to do any network media stuff.
That's all I can think of. Any advice or wisdom to pass on??