When is a permit required? A permit is required whenever an owner or his authorized agent (usually a contractor) proposes to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, including electrical, plumbing, gas, heating and air conditioning, fire sprinkler and fire extinguishing systems, signs, elevators, incinerators, furnaces or boilers. A permit is also required for fences, tents, satellite dishes or portable storage structures.
found this here. Guess I won't be installing in Jackson Ms anytime soon. However, it was my impression that this was against the OTARD rules found here.
The rule prohibits most restrictions that: (1) unreasonably delay or prevent installation, maintenance or use; (2) unreasonably increase the cost of installation, maintenance or use; or (3) preclude reception of an acceptable quality signal.
Anybody ever run into this type of thing before? Is it legal? I was researching to see what type of licenses, ect might be required in MS.