In the past I've always been called in to modify an existing 5-LNB Slimline with a multi-switch (that may or may not need some fine tuning) but this time I will be starting the install with all the sWim equipment already setup & ready to go. Is there a different step or any other procedure I should be looking at before I climb this tall ladder & attempt hitting all five birds?
Thanks.
jtwex
:
Thanks.
jtwex
: