so my friend called me up to come over and stay with her during her installation the other day, she said the installer made her feel a little uncomfortable. Anyway, he shows up at 6pm, rather late, but whatever as long as he gets it done.
It was a 4 room install, on a newer house. 1 622, 1 322. Anyway, the guy didnt finish until 2am!! was this guy just inexperienced? stupid? or does it normally take that long for an install. we were both irritated with him by the time it was done
It was a 4 room install, on a newer house. 1 622, 1 322. Anyway, the guy didnt finish until 2am!! was this guy just inexperienced? stupid? or does it normally take that long for an install. we were both irritated with him by the time it was done