I'm trying to mount a Dish 500 satellite dish on a concrete block wall. I'm using Toggler hollow wall anchors which require a 1/2" hole; I'm also using a 1/2" masonry bit in my drill. Try as I might, I just can't seem to drill holes that line up correctly; the mounting foot ends up being slightly out of plumb (I've tried twice now). I need some tips before my wall ends up looking like swiss cheese.
So what's the trick to drilling correctly-aligned holes so that the mast ends up level, plumb, and true? Any of you pros willing to share a couple of trade secrets?
So what's the trick to drilling correctly-aligned holes so that the mast ends up level, plumb, and true? Any of you pros willing to share a couple of trade secrets?