On some fairly rare occasions, I've found that my 722k will mark an event as done, when in fact, it didn't record it at all.
I never could figure out why it did that. So recently, I've been monitoring my scheduling and noticed that the schedule was showing 3 SAT events to be recorded at the same time. Since I know that isn't possible, I skipped the least wanted event and things were done just fine.
I had checked that schedule the night before and it wasn't scheduled that way then. So now I think I know what is happening, but not the 'why', nor do I know of a way to get it to not schedule too many things at the same time except for checking the scheduling often.
Anyone got ideas??
thanks
I never could figure out why it did that. So recently, I've been monitoring my scheduling and noticed that the schedule was showing 3 SAT events to be recorded at the same time. Since I know that isn't possible, I skipped the least wanted event and things were done just fine.
I had checked that schedule the night before and it wasn't scheduled that way then. So now I think I know what is happening, but not the 'why', nor do I know of a way to get it to not schedule too many things at the same time except for checking the scheduling often.
Anyone got ideas??
thanks