This is what I have to work with. The bucket is full of 40lbs of cement and has another 40lbs in the bag holding it down there are two bungie cords holding it against the railing and the 4x4 add on braces on the top of the railing.
In the 3 years of having this I have not had any problems with wind moving the dish I'm 12 stories up and live in Chicago so I do feel the wind. The reason for the extra 4x4 is to set the dish out far enough to make sure I get a clean shot at the 101, I was able to get 101 fine without it but just a small movement and it was gone so I added it.
Does anybody have any opinions as to what might be a better option for the 5 LNB I am having installed this weekend? I could strap the post to the rail with metal strap but my big problem is bracing the dish with the monopoles if needed.
In the 3 years of having this I have not had any problems with wind moving the dish I'm 12 stories up and live in Chicago so I do feel the wind. The reason for the extra 4x4 is to set the dish out far enough to make sure I get a clean shot at the 101, I was able to get 101 fine without it but just a small movement and it was gone so I added it.
Does anybody have any opinions as to what might be a better option for the 5 LNB I am having installed this weekend? I could strap the post to the rail with metal strap but my big problem is bracing the dish with the monopoles if needed.